WE WON 上海威望科技

UL QFCP Firestop First — for Southeast Asia AI Data Centers & Semiconductor Facilities

UL QFCP Firestop Service
UL QFCP Certified Contractor

UL QFCP Firestop Contractor Services

UL QFCP

UL QFCP firestop delivery for Southeast Asia AI data center and semiconductor projects: drawing review, UL Listed System matching, DRI supervision, English handover packages and traceable penetration records — coordinated with owner, EPC and MEP teams.

UL QFCP Contractor Certification
AI Data Center & Semiconductor Expertise
DRI Supervision & English Project Records
UL Listed System Matching & Traceability
Learn More
Products

A product structure that can grow

Keep protection objectives separate from actuation type. This avoids implying that every rolling shutter has flood performance or that every flood product carries the same certification.

Industrial closure systems
Wind-resistant rolling shutter doors and future industrial-opening products, configured around wind load, opening geometry, material, control and safety.

Flood protection systems
Opening-protection products designed for flood conditions. Approval, test scope, water head, deployment method and electrical-operation boundary are identified separately for each model.

Explore products
UL QFCP CERTIFIED

Firestop Contractor Services

UL QFCP Certified
UL QFCP
International Certification
≥ 2H
Fire Resistance Rating
100%
Penetration Traceable
DRI
Full-Process Supervision
01

UL QFCP Certification

Holds active UL QFCP qualification and is subject to UL Solutions quality-management audits. For each penetration type, we align UL Listed System selection, method review and field quality control with project requirements — supporting international designers, EPC contractors and owners.

02

Systematic Quality Management

Every penetration receives a unique ID and complete photo and data records. We can provide bilingual penetration registers, material and installation records, as-built drawing references and handover packages to support third-party inspection, owner review and project audit readiness.

03

Certified Materials

Selected UL Listed Systems guide compatible material selection and installation methods. Mineral wool fill, sealant application and annular space are controlled to keep the installed construction aligned with the specified system and project requirements.

04

Full-Lifecycle Service

From system design and installation to acceptance testing and scheduled maintenance — a closed-loop service with standardized handover reports ready for any audit or filing.

Full-Lifecycle Service Model

Five-Stage Closed-Loop Service

01

Site Survey & Design

Opening sizing

Risk assessment

02

System Design & Spec

UL system match

FM standard review

03

Certified Installation

Supervision

Penetration tracking

04

Acceptance & Handover

FM compliance report

Full photo archive

05

Training & Maintenance

Staff drill training

Annual functional test

Our Service Commitment

FM/UL compliant delivery — audit-ready at all times

100% penetration traceable — supports third-party inspection

Dedicated technical archives for GMP / FDA audit systems

Rapid response to site changes — maintaining full compliance