FM Approved opening barrier
FM 2510 approval for opening barrier applications, Approval ID PR469796. Select the approved construction and dimensions for the project.
Fast deployment for effective flood preparedness. Bolt-free clamps, modular aluminium panels and three-way EPDM seals simplify protection at building openings. The fully mechanical system is independent of power and supports a clear, repeatable deployment procedure.
FM Approval ID · PR469796
Opening Barrier Applications · FM 2510 · Granted 24 September 2024
View the FM certificate

Approx. 3 minutes applies to a standard opening, with two trained people and panels stored nearby. Actual deployment time depends on the configuration, access, storage and operator training. Permanent rails and anchorage remain part of the installation.
FD-02 · FM 2510
| Max. approved water depth | Max. approved section width | Configuration notes |
|---|---|---|
| 1.8 m | 2.8 m | Single or multiple sections in series. Multiple sections require intermediate support mullions. |
| 1.2 m | 3.9 m | Single sections greater than 2.8 m; maximum approved section width 3.9 m. |
Source: the Approval Guide table included on catalogue page 7, referring to installation manual WW-FD02-IM-EN, revision 20240820. Its width/water-depth combinations must not be combined independently. The catalogue's “up to 4 m” span statement is not a blanket FM approval for every 4 m-wide or taller opening. Confirm the current FM Approval Guide and the applicable installation manual before specifying.
View the catalogue's approval tableDEPLOYMENT DESIGN
FM 2510 approval for opening barrier applications, Approval ID PR469796. Select the approved construction and dimensions for the project.
Two trained people deploy a standard opening in approx. 3 minutes with panels stored nearby. The system needs no electrical power.
No special tools or deployment bolts are required. Top compression and side clamps reduce loose parts and variation from tightening individual fasteners.
Slide the panels into the rails from the installation side, layer by layer, without lifting them above the rail tops.
The catalogue describes spans up to 4 m without intermediate supports. Wider openings can use removable intermediate supports as configured; the approved width and water depth must be checked separately.
| Feature | Bolted barrier | FD-02 clamp-lock system |
|---|---|---|
| Panel insertion | Panels are lifted above the rails and lowered into place. | Panels are inserted horizontally from the installation side. |
| Locking | Bolts are tightened individually, usually with tools. | Top compression and side clamps; no deployment bolts. |
| Deployment readiness | Tools, bolts and panels need separate checks. | Numbered panels and dedicated storage support quick retrieval. |
Actual designs vary by brand, model and site conditions. Height increases require suitable rail provision and compatible panels; they are not an unrestricted upgrade.
APPROVAL AND TESTING
The catalogue states that certification tests cover leakage, structural integrity, impact and durability. It presents a 120-minute full hydrostatic pressure test, leakage observed in testing ≈ 0, a 50 kg log impact and passed water-jet/durability tests.


These are results reported in the supplied catalogue. “≈ 0 observed in testing” is not a zero-leakage guarantee under every site condition. The stated allowable leakage rate ≤ 1 L/h/m is a separate acceptance figure, not the measured total leakage of a door. Verify test and approval documents against the required flood head and installed configuration.
FD-02
Position the panels, apply top compression and engage the side clamps. No special tools or bolts are required for deployment.

Place the dedicated bottom panel in position.

Insert horizontally from the installation side and stack in sequence.

Use the side clamps to prevent the panels from moving.

Press the top handles to apply vertical sealing pressure.

Rotate the side clamps to complete lateral locking.
Approx. 3 minutes applies to a standard opening, with two trained people and panels stored nearby. Actual deployment time depends on the configuration, access, storage and operator training. Permanent rails and anchorage remain part of the installation.
FD-02






Flood protection is selected against opening geometry, structural conditions, flood exposure, drainage and daily operation. Use around chemical storage or BESS does not itself establish fire, explosion or chemical-containment performance.
Opening dimensions, structural conditions, drainage and operating space.
Configuration matched to flood protection height, opening width and site conditions.
Rails and seals, functional testing and documentation.
Deployment, dismantling and storage procedures.
Periodic checks and deployment drills to maintain readiness.



FAQ
The FD-02 Quick-Fit Buckled Flood Door has FM Approvals Class 2510 approval for Opening Barrier Applications, Approval ID PR469796, granted on 24 September 2024. The approved construction and dimensions must be checked in the current FM Approval Guide and the installation manual.
The catalogue's Approval Guide table shows up to 1.8 m water depth with a 2.8 m section width, and up to 1.2 m water depth with a 3.9 m section width. The first configuration can use single or multiple sections, with intermediate supports for multiple sections. These are paired configurations; do not combine the maximum width of one row with the maximum depth of the other.
No. The product overview describes a span up to 4 m without intermediate supports, while the reproduced FM table lists specific approved widths and water depths. Product span capability and FM approval scope are not interchangeable. Confirm the required width, flood head, supports and installation details for the project.
The catalogue states approx. 3 minutes for a standard opening with two trained people and panels stored nearby. It is not a universal maximum time. Larger configurations, longer retrieval routes, access constraints and operator training can affect deployment time.
The catalogue reports leakage observed in testing ≈ 0 during a 120-minute full hydrostatic pressure test. It separately states an FM allowable leakage rate ≤ 1 L/h/m. A test observation is not a guarantee of zero leakage at all installations; acceptance should use the relevant documents, flood head, configuration and site sealing conditions.
FD-02 is fully mechanical and needs no electrical power, special tools or deployment bolts. Panels slide horizontally into the rails from the installation side. Deployment then uses temporary side-clamp restraint, top compression and final side-clamp locking. Permanent rails and anchorage still require proper installation.
Send your opening dimensions, required flood protection height and site photos. We will help assess the configuration, approval scope and deployment arrangements.
Discuss your opening